The old boilers were
removed from what is the backstage area and dressing rooms.
And in keeping with the flavor of the The Factory, one of
the smaller boilers is displayed outside the theatre and is
used as unique signage.
|
 |
|
(above) Structural repairs in progress
in what is now the seating area (or house).
(below) How the interior looked when
we first saw the building. Many support beams and posts were
removed as was the original restroom (lower right of photo)

|
|
|
FROM BOILER ROOM TO THEATRE
Renovations to the old
boiler room at The Factory began in November 2000. The theater
opened on March 16, 2001.
|
 |
| The bulging (south) brick wall to what
was formerly the "sawdust room" (and what is now the theatre
lobby) was replaced. |
|


(above) The south exterior
view of the building as we first saw it prior to renovation.
Today the lobby entrance is on the right hand side where the
two horizontal support beams were attached to the brick wall.
|
|
Order Now by Calling:
615-794-7744
|